Range Officer Work List

Big Salty Range R.O. Work Projects To Keep R.O. Status
Paint and some other materials/purchased items can and will be provided as needed.
Please log any work on the Range Officer Log form.

  • Pick up brass on any bay. Time spent ,bay or bay's brass was picked up on needs to be recorded along with a picture of your brass collection needs to be texted to 801-641-4397 before it will be accepted for range work hours.
  • Replace overhead lights in the classroom with LED fixtures that the range will supply as needed.
  • Empty garbage cans on all 14 bays and pavilion into the dumpster in the middle of the range.
  • Walk around the range and pick up all loose garbage that has been blown around by the wind.
    • If you are the only one on the range and there is no live firing going on you can clean garbage off of the back berm and side berms.
  • Pick up all discarded shotgun hulls on all bays and put them in the shotgun hull collection can by the pavilion that is clearly marked.
  • Clean up the front gate area.
    • Pick up and dispose of all garbage and material by the front gate.
    • Trim weeds and make the entrance to the range look good.
    • Fill in low spots from the paved road to the dirt road with dirt or gravel from the range that we will have on site.
  • There is a safety table just inside of the front gate that is the “Designated” area for unloading/loading your carry gun when you enter/leave leave the range. This table needs to be painted and have a sign designating its purpose for all to see clearly.
  • There is a drainage ditch that runs from the Outhouse Bay to the south berm, there are pipes that drain the range of water that need to be cleared out on a regular basis.
    • Clean out the drainage ditch of any debris.
    • Pipes running under the road to the courthouse bay need to be clean and free of obstructions on both sides and need to have a hole dug if front of both ends of the drain pipes.
    • Exit pipe in the ditch at the south end of the range needs to be clear of any debris and have a have a hole dug in front of the drain.
  • Walk the range and return props to their proper home.
    • Barrels, Cowboy steel on the Courthouse, target stands and other miscellaneous items need to be returned to where they belong each week.
  • All railroad ties around the main drainage ditch have floated out of place and need to be put back around the drainage ditch.
  • All railroad ties need to be straightened and leveled throughout range.
  • Outhouse on the Outhouse Bay is being used as a storage shed and needs to be cleaned out and repaired form wind damage.
  • Silver Connex on the North side of the classroom is a junk yard that needs to be cleaned up.
    • All lumber, pallets etc. that are still useful need to be saved but should be stacked and organized in a central location.
  • Mine Shaft tin roof needs to be repaired or replaced.
  • Junk yard at the far East end of the range needs to be cleaned up.
    • Clean out all of the tumbleweeds and overgrown weeds.
    • Throw away anything unneeded junk. (If dumpster is full, please report.)
    • Organize and stack any useful material.
  • Loading Tables
    • Repair/replace all loading table tops and reinforce centers.
    • Rebuild/repair all roofs.
  • Repair and restack rocks and railroad ties at beginning of all berms.
  • Blue Bell Chapel Bay
    • Chapel needs new paint.
    • Fence in front needs repair and new paint.
    • There is a big hole in the roof that should be patched.
    • Pull down any remaining ceiling or wall boards to leave the studs exposed, right now it’s about half and half and looks bad.
    • Repair/reinforce railroad tie berm.
    • Build a new coffin at front door (paint in corresponding color).
  • Bank Bay
    • Repair window bars.
    • Repair safe surround.
    • Repair swinging doors.
    • Repaint as needed.
  • Mine bay
    • Repair and straighten several railroad tie walls.
    • Rebuild or discard railroad tie shaft at end of bay.
    • Close off side tunnel.
  • Train Bay
    • Move train.
    • Repaint ticket booth and surrounding props.
    • Reinforce railroad tie walls between bays.
    • Clean up entrance to buried trailer.
  • Dry Goods bay
    • Reinforce fold down windows with new hinges.
    • Paint
    • Discard destroyed railroad ties in dumpster.
  • Stagecoach Bay
    • Stack railroad ties and clean up entrance to buried trailer.
  • Hotel Bay
    • Remove railroad ties in ground.
  • Jail Bay
    • Remove and replace corrugated metal with wood slats from exterior of jail.
    • Repair window and door hinges.
    • Repair rain gutter.
    • Reinforce interior side table tops.
    • Remove gun drop buckets.
  • Cemetery Bay
    • Remake grave marker around posts.
    • Rework berm ends with rock and railroad ties.
  • Courthouse Bay
    • Fake brick façade on the front of the courthouse needs to be re-attached and fixed.
    • Either repair or dispose of broken spools.
    • Repair or add rain gutter.
  • 75 Yard Bay (Gallows)
    • Repair/maintain steel plate rack.
    • Remove all rocks from bay.
  • 100 Yard Bay
    • Remove all rocks/bricks/blocks from bay.